L3 Station: Installations Canyelles - Trinitat

  • L3 Station: Installations Canyelles - Trinitat

L3 Station: Installations Canyelles - Trinitat

Stretch of Line 3 of the Barcelona Metro.

Segments

Transport and Public Buildings

The new stretch of Line 3 in the Metro system between Canyelles and Trinitat Nova began operating at the end of 2008 and provided nine additional stations and a large interchange connecting lines 3, 4 and 11 in Trinitat Nova station

Orona solutions installed:
-10 escalators

1 Indoor escalator, vertical height climbed 5590 mm, 27.3 dm inclination, step width 1000 mm, 0.5 m/s, 6000 pers/h.

1 Indoor escalator, vertical height climbed 5575 mm, 27.3 dm inclination, step width 1000 mm, 0.5 m/s, 6000 pers/h.

2 Outdoor escalators, vertical height climbed 6760 mm, 27.3 dm inclination, step width 1000 mm, 0.5 m/s, 6000 pers/h.

2 Indoor escalators, vertical height climbed 4740 mm, 27.3 dm inclination, step width 1000 mm, 0.5 m/s, 6000 pers/h.

2 Indoor escalators, vertical height climbed 4975mm, 27.3 dm inclination, step width 1000 mm, 0.5 m/s, 6000 pers/h.

2 Indoor escalators, vertical height climbed 5560 mm, 27.3 dm inclination, step width d1000 mm, 0.5 m/s, 6000 pers/h.