1. Home
  2. References
  3. Miribilla Station

Representative buildings with ORONA adaptation projects We can provide the best solution for installation, maintenance, and modernization of elevators, escalators, moving ramps and walkways for every need, at both the technological and design levels.

Reference search feature

Search using text

Ej. shopping centres buildings without elevators

Advanced search

Miribilla Station

  • Miribilla Station

Miribilla Station

Miribilla station is part of the C-3 line run by Renfe Cercanías Bilbao.

Segments

Transport and Public Buildings

The station is almost 50 metres underground, making it the deepest station in the Adif network.

Platform access is by lift (the station has a total of seven lifts) or escalator.

Orona solutions installed:

  • 7 lifts
  • 1 Electric lift 1250 kg, 1 m/s, 2 stops, speed control VVVF.
  • 6 Electric lifts 1600 kg, 1.6 m/s, 7 stops, speed control VVVF.

Other similar references

If you would like more information about our installation of elevators, escalators, moving ramps and walkways, or about other Orona services

Request information

(C) Orona. All rights reserved

Up